|
The Pre-build
|
|
The build
|
|
Choosing the Brooklands
and getting the bike donor |
|
Buying the 2CV and
stripping the bike |
|
Stripping the 2CV
|
|
Stripping the 2CV and
starting the re-furb
|
|
Continuing the refurb
|
|
Completing the refurb,
gearbox and engine
|
|
Starting the build,
suspension |
|
Floorpan, rear
bulkhead |
|
Front bulkhead
glovebox, engine in
|
|
Front brakes,
handbrake, gearlever |
|
Wiring, steering,
carbs |
|
Engine start,
clutch problems |
|
Running vehicle
Dashboard
|
|
Panels
|
|
Seatbelts,
bodywork
|
|
Bodywork, Fuel
filler |
|
Seats, wings
exhaust |
|
Lights, finishing
items
|
|
MOT and SVA
prep |
|
Emissions problems
|
|
Engine and SVA
prep |
|
SVA fail
|
|
Brakes revisited and
SVA PASS
|
|
Post Build Updates
|
|
First real drives
|
|
Stonleigh
|
|
Rear seats
|
|
Broken stud
|
|
Using it
|
|
Another stud
problem |
|
Engine scrap!
|
|
New crankcase
|
|
Tinkering
|